Inquiry Now
En

Case Studies

Contact us

Zhengsai Shield: Construction Scheme for Fluidized Soil-forming Material Backfill in Trench Fertilization for an Underground Garage in Shanghai

Zhengsai Shield has learned that this project includes a one-story underground garage. The excavation depth of the foundation pit is approximately 5.6 meters, and the retaining structure of the foundation pit adopts the "SMW" method. The distance between the retaining structure and the underground structure is about 0.8 meters.

According to the project requirements, it is planned to use Zhengsai Liquid Solidified Soil for backfill in certain areas of the trench fertilization zone.

Zhengsai Shield: Construction Scheme for Fluidized Soil-forming Material Backfill in Trench Fertilization for an Underground Garage in Shanghai

Zhengsai Shield: Construction Scheme for Fluidized Soil-forming Material Backfill in Trench Fertilization for an Underground Garage in Shanghai

Zhengsai Shield: Construction Scheme for Fluidized Soil-forming Material Backfill in Trench Fertilization for an Underground Garage in Shanghai

Start your project with a free consultation. Get a tailored solution from Zhengsai’s experts.
Discover cutting-edge solutions and products at
Zhengsai International Group – your partner for sustainable
ecological restoration solutions worldwide!
Phone/WhatsApp:

+86 15137139713

Contact Us

  • Address:

    Building 12, Shangjin Street, Zhengzhou City, Henan Province, China

  • Email:

    FrankWangRD@gmail.com
    Fuzhou.Wang@zhengsai-international.com

© 2025 Zhengsai International Group Co., Ltd. All Rights Reserved. Privacy StatementTerms & ConditionsSitemap
© 2025 Zhengsai International Group Co., Ltd. All rights reserved. Privacy StatementTerms & ConditionsSitemap